Thread: Pavilion Reef Work
-
11-18-2018, 12:23 AM #1We are there! Let's go fishing!!
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,269
- Thanks
- 8,068
- Thanked 13,797 Times in 4,056 Posts
- Blog Entries
- 6
Pavilion Reef Work
Spud barge heading out from Perdido Pass Saturday afternoon...Be on the lookout for more nearshore reef work being conducted Saturday! Work will be conducted at the Gulf State Park Pavillion circalittoral reef site. The contractor will be using a crane barge with spuds to install the reefs (i.e. a jack up rig will not be used during installation). Work is set to begin Saturday around noon and complete the installation on Monday if weather remains calm.
-
11-18-2018, 08:54 AM #2We are there! Let's go fishing!!
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,269
- Thanks
- 8,068
- Thanked 13,797 Times in 4,056 Posts
- Blog Entries
- 6
The Reefmaker is on site just outside the sandbar from the Pavilion early this Sunday morning...

Photo by Milton Rittelmeyer
-
11-18-2018, 08:58 AM #3We are there! Let's go fishing!!
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,269
- Thanks
- 8,068
- Thanked 13,797 Times in 4,056 Posts
- Blog Entries
- 6
Another view, this one by Steve Jones...


3Likes
LinkBack URL
About LinkBacks



Reply With Quote

https://www.facebook.com/hatchet.s.spoons
Mullet Wrapper: Pier & Shore...